6 domains · 32 scored modules · 5 maturity levels
The Time Plus One Blueprint
An instrument for reading operational discipline in a fab Facilities organization, built inside two decades of running them. It reads a facility against evidence, not against what the facility says about itself. Published here in full: yours to read, use inside your own fab, or set aside.
The five levels
Maturity is durability, not a peak
A level you sustain, not a level you touch once in a good quarter. Most people place themselves one level too high.
1
Reactive
Managed by what breaks. Knowledge lives in individuals.
2
Aware
Intent without clarity. Most facilities live here.
3
Defined
Documented, followed, consistent.
4
Managed
Decisions driven by data; gaps caught early.
5
Optimizing
Sustaining, not performing. Requires sustained Level 4 for a year or more, evidenced by twelve or more months of records reviewed on cadence.
Method
How it reads a facility
It references the standards a fab already lives under (PSM, RMP, NFPA, FM Global, SEMI) but scores a discipline broader than any of them. It does not measure conformance, and it does not benchmark you against peers.
- Evidence, in order
- Direct observation outranks what someone tells you; what a knowledgeable person tells you outranks a document. What people say about their own facility is an input, not evidence in itself.
- The scoring method
- Each rubric level breaks into numbered elements, each characterized against evidence. No element is scored Demonstrated on interview alone. A module holds Level N only when every element of Level N and below is demonstrated.
- Integers and memos
- Scores are whole levels. Every score ships with a scoring memo tracing each element to the evidence behind it.
- No overall number
- The Blueprint never rolls a facility up into one score, and no domain is a decimal average. Averaging ordinal levels manufactures precision the scale does not contain.
Domains
Six domains, 32 modules
The sequence is I, then II, then III, then IV, V and VI in parallel. Documentation comes first, deliberately: safety improvement that outruns documentation discipline decays, because procedures, permits and RCA findings are all controlled documents.
Two boundaries hold regardless. Hazard remediation is never sequenced: a Critical Threshold gap is worked from day one. And within a domain, module order is a default, not a gate.
Domain I
Reported as: profile
Documentation & Systems of Record
The substrate.
- M1
Document Control System
Controlled documents, versioning, the single source of record.
- M2
CMMS
The maintenance system of record, including facility-caused unscheduled downtime as a distinct reporting line.
- M3
Configuration Management
The as-built truth of the facility, and the control that keeps it from drifting.
Domain II
Reported as: floor
Safety & Compliance
The non-negotiable foundation. Two Critical Threshold Flags.
- M4
EHS Integration
Environmental, health and safety built into operations, not bolted alongside them.
Critical threshold Issue 13 - M5
Compliance & Regulatory Management
The program that keeps the facility inside its obligations, evidenced rather than asserted.
Critical threshold - M6
Three Corners Safety & Code Discipline
FM Global, NFPA 318 and IFC Chapter 27 reconciled by an assigned owner, not left to disagree.
- M7
Management of Change
The discipline that catches what a change breaks before the change is made.
Domain III
Reported as: profile
Maintenance & Reliability Execution
The operational heart.
- M8
Work Order-Driven Operations
Work that runs through the system, so the record is the reality.
- M9
Purchase and Work Order Synergy
Purchasing and maintenance as one system, or as two fictions.
- M10
Project Management
Projects that end at commissioned reliability, not at handover.
- M11
Strategic Scheduling and Planning
A schedule that is resource-loaded and constraint-tested, not a calendar of hopes.
- M12
Maintenance Task Selection Discipline (RCM)
PM tasks that earn their place, not tasks that persist from habit.
- M13
6S System Implementation
Workplace discipline as an operating condition, not a cleanup: Sort, Set in order, Shine, Standardize, Sustain, Safety.
Domain IV
Reported as: floor with full profile
Utilities & Infrastructure Discipline
Organized by failure-mode family. A utilities domain is only as reliable as its weakest critical system.
- M15
Electrical & Power Reliability
Normal and emergency power, UPS, and SEMI F47 sag posture treated as a capital portfolio: event capture, tool-level attribution, immunity gaps.
- M16
Cleanroom Environment Control
HVAC, temperature and humidity, pressurization cascade, ISO 14644, particle monitoring, post-maintenance requalification.
- M17
Process Fluids, Gas & Mechanical Utilities
UPW, PCW, bulk and specialty gas, CDA, process vacuum.
- M18
Exhaust & Abatement Reliability
General and acid exhaust, abatement, tested fan redundancy, rebalance-after-install, the RMP/PSM interface.
- M19
Industrial Waste Treatment & Discharge
The plant operated, not tended: internal action limits inside permit limits, field-verified drain segregation, permit margin as a KPI. The one utility where a bad day is a legal event.
Grouped modules trade diagnostic resolution for assessment feasibility. The trade holds because the scoring memo characterizes elements per system within each module: a site cannot hide a weak system behind a strong one inside the same module.
Domain V
Reported as: profile
People, Roles & Development
The full depth of workforce discipline.
- M20
Comprehensive Training Matrix
Operational job analysis, skills demonstration, cadence. Not a sign-in sheet.
- M21
Integrated Cross-Training Program
Cross-qualified depth per critical system.
- M22
Shift Handoff Discipline
Active alarms, degraded equipment, work in progress: communicated and received.
- M23
Supervisor & Leadership Development
Mentorship, progression, succession depth.
- M24
Knowledge Retention & Succession Risk
Tribal knowledge captured; what the organization would lose if a key person left tomorrow.
- M25
Staffing Model & Coverage Discipline
Headcount structure, on-call rotations, shutdown and turnaround coverage: planned, not improvised.
Domain VI
Reported as: profile
Management Systems & Continuous Improvement
Connecting operational reliability to organizational performance.
- M26
Performance Metrics & Decision Making
Metrics used to drive decisions; tiered cadence and floor presence; loss economics; ISA-18.2 alarm-load discipline.
- M27
Business Continuity and Recovery
A plan rehearsed, not a plan filed.
- M28
Risk-Based Quality Assurance
Incoming parts, PM completion quality, contractor work acceptance, calibration: attention spent where risk is, not spread evenly.
- M29
Vendor & Contractor Management
Qualified before they work, supervised while they work, integrated into the work order system.
- M30
Budget & Capital Planning Discipline
Reliability data driving budget justification; deferred maintenance carried in financial terms; capital defended with evidence, not instinct.
- M31
Fab Interface & Tool Owner Relations
The fab interface as a partnership, not a ticket queue.
- M32
Continuous Improvement Culture
Improvement that survives its own success.
Critical Thresholds
M4 · M5
Some gaps cannot be averaged away. Safety cannot be averaged.
EHS Integration (M4) and Compliance & Regulatory Management (M5) carry Critical Threshold Flags. A score below Defined moves the gap straight to Tier 1 of the Roadmap, however strong the rest of the facility is.
At PSM/RMP-covered fabs, Management of Change and Mechanical Integrity scoping that does not reflect Wynnewood Refining Co. v. OSHRC (10th Cir. 2020) on interconnected utilities fires the M4 flag regardless of the module score.
Reporting
A profile tells the truth a single number is built to hide
There is no overall facility number, and no domain is reported as a decimal average. Each domain is reported the way its risk behaves.
Domain II: floor
The domain score equals its lowest module. A single weak safety module is the domain's result; strong modules do not lift it.
Domain IV: floor, full profile shown
The floor is the domain's reliability, and all five module scores are shown alongside it.
Domains I, III, V, VI: profiles
The set of module scores, each with progress toward the next level: "Level 2 achieved; 4 of 6 Level 3 elements demonstrated."
Roadmap
The Blueprint diagnoses. The Roadmap orders the response.
Five tiers. Each item carries its current level, target level, time horizon, owner, near-term actions and dependencies.
- Tier 1
Critical Gap Remediation
Critical Threshold gaps and known hazards. Worked immediately, never sequenced.
- Tier 2
Foundational Dependencies
The documentation and systems other gains depend on.
- Tier 3
High-Impact Gaps
The largest reliability exposure per unit of effort.
- Tier 4
Advancement Opportunities
The moves from Defined toward Managed.
- Tier 5
Sustaining Excellence
What holds a level once reached.
Where are you, actually?
Hold the Blueprint up against your own fab. But you can't fully diagnose yourself: familiarity overwrites the gaps an outsider would stop and flag. Self-scoring finds the shape of the gap. It cannot verify the closure.